Recce
Checklist
|
Name
of location ..Great Yarmouth Pier. ......................................................................................................................................
Things to take:
|
||
Stills Camera
|
ü
|
Take stills/camera to use for test shots of the location.
|
Mobile phone
|
ü
|
Take mobile phone in case of the need for communication or
travel information.
|
Notebook, pen,
|
ü
|
Take a notebook and pen to write down any additional notes
needed on the location
|
Programme risk assessment form
|
ü
|
Take risk assessment form to fill in at the location.
|
Maps/directions
|
||
ID
|
||
Brief
|
||
Checklist
|
||
Talking to people:
|
||
Confirm ownership
|
No pass or confirmation of ownership will be required as
we will be filming at a public place.
|
|
Exchange details
|
||
Explain intentions
|
||
Discuss fees/contract
|
||
Editorial policy
|
||
Are passes required?
|
No
|
|
Availability and timings
|
||
Local events
|
ü
|
Check to see if there are not any local events happening
at the location when we plan to film there.
|
Dress code
|
||
Copyright issues
|
||
Children’s details
|
||
Transport/access:
|
||
Landmarks for directions
|
||
Neighbour disturbance
|
||
Risk of trespass
|
||
Internal access
|
||
Vehicle access
|
||
Toilets
|
ü
|
Check that toilet facilities are available for use by the cat
and crew on the day of filming.
|
Traffic control needed?
|
No
|
|
Shelter
|
||
Safety for hazardous environments
|
||
Tidal waters
|
ü
|
Check tidal waters to see that it will not disrupt
filming.
|
Boats/safety
|
||
Camera/lighting:
|
||
Position of the sun
|
ü
|
Check for the position of the sun at the different times
of the day we plan to film at.
|
Window direction
|
||
Power supply
|
||
Size of location
|
ü
|
Check that the size of the location compared to cast, crew
and public will be big enough as to not hinder filming.
|
Strobing
|
ü
|
Check that any strobing or lights from the pier/fair will
not disrupt filming.
|
TV/computer screens
|
||
Is floor level?
|
Yes
|
|
Secure place for kit
|
ü
|
Check that equipment can be stored securely when filming.
|
Cables
|
ü
|
Make sure cables from electrical/machinery on location
will not be a hazard.
|
Smoke alarms/sprinklers
|
||
Sound:
|
||
Listen
|
ü
|
Listen for sounds on location at the different times of
the day we plan to film on to see that they will not be too disruptive.
|
Traffic/roadworks
|
||
Aircraft
|
||
Electrical hazards
|
ü
|
Check that rides on the pier will be safe to film around.
|
Schools
|
||
Weather
|
ü
|
Check that weather will not be a hazard when filming.
|
Background music/PA system
|
ü
|
|
Air conditioner/fridges/etc
|
||
Wooden floors
|
ü
|
Check that structure of the wooden floor of the location
is safe to film on.
|
Things for director:
|
||
Take photos
|
ü
|
Take test shots of the location to check for suitable
lighting.
|
GVs/top shots
|
||
Cutaways
|
||
Backgrounds
|
ü
|
Take background shots to see if they will fit the brief of
the music video.
|
Events
|
||
Additional contributors
|
||
Food/accommodation:
|
||
Eating
|
ü
|
Check that eating facilities are available to be used by
cast/crew on the day of filming.
|
Hotels
|
||
No comments:
Post a Comment